The detailed design of the proposed footbridge is in progress.

The design of proposed footbridge scheme was presented in the Yuen Long District Council Traffic and Transport Committee Meeting held on 10 March 2016 and was supported by the Committee at the meeting.

The scheme of the project was gazetted in accordance with the Roads (Works, Use and Compensation) Ordinance on 28 October 2016 and was authorized on 20 January 2017.

 