Elevated Pedestrian Corridor in Yuen Long Town connecting with Long Ping Station
Homepage What's New Introduction Project Features Relevant Documents FAQ Contact Us
    ENG \ 繁體 \ 简体 \ TEXT ONLY \ 繁體純文字 \ 简体纯文字
  Overview  
     
  Project Background  
     
  Project Scope  
     
  Feasibility Study Stage  
     
  Investigation Stage  
     
  Design Stage  
     
     

Investigation Stage

In December 2014, Highways Department commissioned a consultancy for the Investigation, Design and Construction of the project.

The major task of the investigation stage is to review findings in the feasibility study stage and to take into account the public’s views to develop the design scheme of the proposed footbridge.

Other major tasks in the investigation stage include traffic impact assessment, environmental impact assessment, and drainage impact assessment, etc.

 

 

 

 
Privacy Policy \ Copyright \ Disclaimer \ Suggestions